Project Description
Extensive bathroom remodel. Old tub was removed and bathroom tore down to studs. A new custom tiled shower was added as well as many custom details such as simulated stone backsplash behind sink and toilet.
- Original sink before remodel
- Original – old bathtub
- Tearing out old bathroom
- Repairing framing
- Original drain
- Original plumbing
- Tearing bathroom down to studs
- Tearing bathroom down to studs
- Repairing framing
- Adding insulation
- Repairing leaking toilet outlet
- Plumbing repair
- Floorboards
- Installation of flooring
- Float and tape of moisture resistant drywall
- Framing of shower ledge
- Shower installation
- Shower Installation
- Liner Installation
- Durorock and liner
- Durorock and liner
- Liner Installed
- Floor preparation for stone work
- Cement board installation
- Beginning tile-work
- Installation of stone backsplash
- Tile installation
- Corner tile shelves
- Tile installation
- Positioning drain
- Shower liner
- Tile detail
- Floorstop
- Shower door view
- View from open shower door
- Installation of sink
- Before toilet installation
- Custom stone floor for shower
- Alternate shower view
- Tile detail
- Cabinet, toilet and stone backsplash
- Mirror sink and backsplash